(888) 216-1885
Glendale bathroom in travertine: a frameless glass shower with a hand shower and a corner bench beside a jetted tub set in a travertine deck under a shaded window
Glendale bathroom, posted May 2013.

A city in Los Angeles County

A Glendale bath in travertine, and a first-home kitchen

Skyline Construction and Remodeling posted a Glendale bathroom remodel in May 2013, travertine from floor to window with a glass shower and a jetted tub, and in 2021 remodeled the kitchen of a client whose profile gives Glendale. The City of Glendale issues the permits, online only, after Planning clears any exterior change.

Who issues permits here

Building permits in Glendale are issued by the City of Glendale Building and Safety Division, not by Los Angeles County, and every application goes through the City's online permits portal.

Jobs we have done in Glendale

  1. 2021Kitchen remodelFrom the client's review: Sevana S. (Yelp, May 21, 2021); place from her profile.
  2. 2013 or earlierPrimary bathroom remodelOur own dated photograph.

Neighborhood and year only. We never publish a client's street or address.

What has Skyline built in Glendale?

A primary bathroom, posted in May 2013. Travertine runs from the floor up the tub deck and the shower walls, with a diagonal band of squares under the window. The shower sits behind frameless glass with a wall head, a hand shower on a slide bar and a corner bench; the jetted tub drops into a travertine deck with a bronze filler. The caption lists new cabinets, a granite counter, LED and recessed lights, plumbing and paint.

In 2021 a client whose Yelp profile says Glendale wrote about the kitchen of her first home, and that the crew worked in her husband's changes after it was finished. Her review does not name the street or city of the house, so we give the place as her profile gives it.

Does a Glendale remodel go through design review?

Only if it touches the outside. An interior remodel with no exterior change is applied for as an alteration and repair. A new or replaced window or door counts as an exterior change in Glendale, and so do siding, roofing and site work, and those projects clear Planning before the building permit is accepted.

How long does Glendale plan check take?

The City gives about eight to ten weeks for regular plan check, counted from the day the plan check fees are paid. Nothing is filed at a counter: the application, review and permit all run through the portal, and the owner's details go on the application even when the contractor files it.

The rules, from the people who set them

  1. Windows, doors, siding, roofing and site work all count as exterior changes.

    Please note exterior changes include windows/doors (new, replacement or removal), siding changes, roofing changes, site work, etc.

    City of Glendale, Permit Application Guidance (glendaleca.gov), read .

  2. Regular plan check takes eight to ten weeks from payment.

    Regular plan check takes about 8-10 weeks from the date plan check payments are made.

    City of Glendale, Development Services FAQ (glendaleca.gov), read .

  3. Permits are filed, reviewed and issued online only.

    nothing is submitted in person

    City of Glendale, Development Services FAQ (glendaleca.gov), read .

  4. The owner's details go on every application.

    Please note all applicants need to provide the property owner's information (not the tenant or business) at the time of the application submittal.

    City of Glendale, Permit Application Guidance (glendaleca.gov), read .

What a client here wrote

After completing the kitchen remodel they even worked in a couple changes my husband made along the way.
Sevana S., Yelp, May 21, 2021

Yelp profile location: Glendale.

Nearby, what we build here, and the permit questions

A job in Glendale?

Eric comes to the house, walks it with you and writes the estimate himself. The visit and the written estimate are free.

(888) 216-1885

22647 Ventura Blvd, Suite 704, Woodland Hills. CSLB license #859873.

Please tell us your name.

Please give a phone number with at least 7 digits, so we can reach you.

This email does not look complete. Check it, or leave it empty.

We use your details only to reply about this job. They are never sold or shared. Privacy

Prefer to talk first? Call (888) 216-1885.