Woodland Hills and across Los Angeles and Ventura counties Kitchen remodeling, priced by the owner.
Skyline Construction and Remodeling is a licensed general building contractor in Woodland Hills (licensed since 2005) that remodels kitchens in Los Angeles and Ventura counties. Owner Eric Saida writes every estimate.
Rules and license record on this page checked .
- Eric SaidaThe owner writes every estimate. About Eric
- #859873CSLB license, class B, since 2005. See the record
- 600+client reviews on five sites. Read them
- FreeThe visit and the written estimate
How long it took, in their words.
Every kitchen client who wrote down how long the work took, exactly as they wrote it. These are past jobs, not a promise: the schedule for your kitchen is set when Eric has seen it.
From the day that demo was started to us moving back into our wonderful new kitchen was only 3 weeks!
Malisa K., Kitchen remodel. Yelp review, April 2022.
It all finally came together over the course of about 5 weeks and it was superb beyond our expectations!!!
Mitch P., Kitchen remodel. Yelp review, September 2014.
The entire job took about 45 days with the delays caused by city inspections.
Rob F., Kitchen remodel. Angi review, May 2013.
The bulk of the kitchen was functional within 3-4 weeks.
Kristine S., Kitchen remodel. Angi review, October 2012.
… I think 4 weeks for completion was extraordinary.
David W., Custom kitchen, Tarzana. Yelp review, February 2012.
The job took them 4 weeks to finish, they were very clean, came to work every day and answered all of our questions.
Eldar A., Kitchen and bathroom. Angi review, May 2011.
Angi reviews are quoted but not linked. Dates are when each review was posted.



What a kitchen remodel in Los Angeles and Ventura counties includes
A kitchen remodel involves layout and cabinet design, permits, demolition, any wall, plumbing, gas and electrical changes, then cabinets, counters, tile and lighting.
- A visit from Eric Saida, the owner, who measures the room and writes the estimate himself
- The job priced more than one way, so you can choose
- Help choosing cabinets, counters and tile, including going to the supplier with you
- The permit application and inspections
- Structural changes when the layout needs them: walls removed, headers and beams added, with engineering and a permit
- Plumbing, gas and electrical moved or replaced
- Cabinets, counters, backsplash, flooring, lighting and paint installed
- A final walkthrough with a written list, closed out before the job is called done
What decides the price
- Whether walls, plumbing or the gas line move
- Cabinets: stock, semi-custom or custom
- Counters and backsplash material
- Appliances
- What the old walls turn out to hide
Eric sees the house before he prices it, writes the estimate himself and prices any options you ask about side by side. No salesperson writes your estimate. The visit and the written estimate are free.
How a kitchen remodel goes
From the first visit to the final inspection by your city or county building department. One person, Eric, knows the whole job.
- Eric visits and prices itHe measures the kitchen, asks how you cook and what bothers you about the room, and writes the estimate himself. You see the job priced more than one way.
- Layout and selectionsThe layout and cabinets are drawn, and you choose cabinets, counters, tile and fixtures. Long-lead items are ordered before demolition so the room is not left open waiting for them.
- PermitIn the City of Los Angeles a like-for-like kitchen remodel can often go through as an Express Permit. Moving or removing walls needs drawn plans and a plan check. Other cities have their own process.
- Demolition and structureThe old kitchen comes out and we see what is behind the walls. If a wall is being opened, the new header or beam goes in at this stage, to the engineer's drawings.
- Rough plumbing, gas and electricalPipes, gas line and wiring are run to the new layout and inspected before the walls are closed.
- Cabinets, counters, tile and finalCabinets are set, counters are measured from the installed cabinets and then fitted, followed by tile, lighting, fixtures and paint. After the final inspection we walk the room with you and finish the list.
A Stevenson Ranch kitchen, from a client who came back
Filmed in July 2019 at the new island. Skyline had already remodeled the family’s previous house; this was the second, with a kitchen and bathrooms in both.
Shown with the client’s permission. Nothing plays until you press play; captions are on.
This is actually the second home that they've renovated for us. We've done kitchens in both houses, bathrooms in both housesHomeowner, Stevenson Ranch, 2019. Second home with us.
Read what he says
Skyline Construction. What else can I say? [I mean,] Eric and his staff have been great. From being on time to the quality of the work has always been excellent. This is the new kitchen that they did for us. This is actually the second home that they've renovated for us.
We've done kitchens in both houses, bathrooms in both houses, and we've always been very happy with Eric and his staff's work. [You know,] Like I said, the quality, the timeliness, and just the effort they put in is just top notch. [And] I highly recommend them. If you're looking to get anything done in your home, definitely call Eric and Skyline Construction.
Words in square brackets were hard to make out in the recording.
A Tarzana kitchen client, on camera
It's a chef's kitchen through and through.
Homeowner, Tarzana, 2013, on video. Kitchen, then two bathrooms. Watch it on the reviews page
What clients wrote about this work
The job was complicated and Skyline excelled at handling the unexpected. Several structural complications arose due to the unique build of the original house. Once beams were exposed, it became clear that certain walls couldn't be taken down, even with the addition of headers. …
Arley E., Yelp review, Aug 17, 2015.
It was a good experience from the signing of the contract and receiving the building permit the SAME day, to the completion of our entire kitchen remodel earlier than the date promised. Eric's assistant Kristina kept us informed when a worker was coming AND what they would be doing that day, a really nice touch. …
Sakaye W., Yelp review, Mar 17, 2016.
He was very up front and extremely honest in his negotiations and we finally settled on a price for the job. He stuck with every promise he made and did not go one penny over our agreement accept in areas we added on as the job progressed. Even those items were priced very reasonably. …
Mitch P., Yelp review, Sep 4, 2014.
Pricing was fair and we moved ahead quickly. From the day that demo was started to us moving back into our wonderful new kitchen was only 3 weeks! We still don't know how that was possible. Eric was here daily, and all of his guys were top notch. Even minor requests on our part were all included and addressed as we went.
Malisa K., Yelp review, Apr 17, 2022.
Eric incorporated everything that I had asked for in my wish list and within only 2 days, submitted to me his 3-D computer-rendered designs, making it incredibly easy for me to see exactly how my kitchen would look after the remodel. …
David W., Tarzana, Yelp review, Feb 23, 2012.
Eric provides clear choices—Options A, B, and C—allowing you to decide the path for your construction project … During our kitchen remodel, Eric’s valuable insights saved us time and money …
Adam A., Google review, about 2024.
His guys did a great job on fixing all the problems the previous contractor created. High marks to his really creative and super conscientious electricians. They were so knowledgeable and careful with everything as were his tile guys. But the pièce de résistance goes to his carpenters. The kitchen cabinets these guys custom made are beyond beautiful.
Rick D., Woodland Hills, Yelp review, Feb 10, 2016.
Want the same for your house? Call Eric on (888) 216-1885 or ask for a free estimate.
What the rules say, from the people who set them
if your kitchen remodeling will involve plumbing, electrical and carpentry work under one contract, you should hire a licensed "B" General Building contractor.
Contractors State License Board (CSLB). What Type of Contractor Do I Need?, read November 25, 2026.
Code requirements vary in different cities and counties around the state.
Contractors State License Board (CSLB). Do I Need a Building Permit for My Project?, read November 25, 2026.
The Express Permit (e-permit) system allows for several small renovation projects, including … remodeling kitchens or bathrooms, adding or replacing plumbing fixtures
Los Angeles Department of Building and Safety (LADBS). Homeowner Step-by-Step Guide, read November 25, 2026.
For simpler projects, an Express Permit may be sufficient, while for more complex ones, a Plan Check may be required
Los Angeles Department of Building and Safety (LADBS). Homeowner Step-by-Step Guide, read November 25, 2026.
When completed, there shall be a final inspection and approval of the completed project.
Los Angeles Department of Building and Safety (LADBS). Inspection, read November 25, 2026.
You must also call for an inspection before covering or concealing any work.
Los Angeles Department of Building and Safety (LADBS). Inspection, read November 25, 2026.
Questions people ask first
How much does a kitchen remodel cost in Los Angeles?
It depends on whether the layout stays or walls, plumbing and gas move, and on the cabinets and stone you choose. Eric writes the estimate himself and can price options side by side, so you see what each choice adds.
How long does a kitchen remodel take?
Clients have written that their kitchens took three weeks, four weeks and about five weeks from demolition to a working room. Those were their jobs; yours depends on the layout changes, the cabinet lead time and inspections. You get a schedule with the contract.
Do I need a permit to remodel my kitchen in Los Angeles?
Yes, in the City of Los Angeles. LADBS says its Express Permit system covers small renovation projects, and its list includes "remodeling kitchens or bathrooms, adding or replacing plumbing fixtures" among others. A same-layout kitchen is usually a simple permit. Removing or moving walls needs drawn plans and a plan check. We file the permit and book the inspections.
Can you take out the wall between my kitchen and living room?
Usually, yes. If the wall carries load, an engineer sizes a beam or header to replace it, the plans go through plan check, and the framing is inspected. One client wrote that we removed a load-bearing wall with a brick fireplace and chimney and rebuilt the ceiling structure. Sometimes the framing shows that a wall has to stay, and we tell you.
Do you help with design, cabinets and materials?
Yes. Clients describe Eric laying out options, revising the plan with them, and going to the stone and tile supplier to help choose. You can also bring your own designer; we have built to an outside designer's plan.
Can we stay in the house during a kitchen remodel?
Most clients do. The kitchen is closed off, the crew protects the floors on the way in and out, and the site is cleaned at the end of each day. You will be without a sink and stove for part of the job.
Is one contractor enough for the plumbing, electrical and cabinets?
Yes. The Contractors State License Board says: "if your kitchen remodeling will involve plumbing, electrical and carpentry work under one contract, you should hire a licensed "B" General Building contractor." Skyline holds a class B license, number 859873, issued in 2005. All the trades are on one contract and one schedule, so you do not hire or chase them.
Ask Eric about your kitchen.
Eric calls you back himself to set a time to see the house. The visit and the written estimate are free.
(888) 216-1885Get this : The work was completed ahead of schedule! Yes that's right - it does happen in remodelling - but honestly not often. …