Skyline Construction and Remodeling wrote this guide, and we are one of the contractors you may be comparing. It ranks no one; every rule in it is quoted from the state body that sets it.
Look up the license yourself
Every contractor's license number can be checked on the CSLB website. Do it before the estimate visit if you can, and again before you sign. Use the number on the contract, not the name: several Los Angeles companies have similar names.
Ours is CSLB #859873, a class B General Building license first issued in 2005. You can check it the same way you would check anyone else's.
Contractors must print their license number on business cards, bids and contracts. A printed number only tells you which record to look up, so check its status rather than taking it on trust.
When the contractor comes to give you a bid, ask to see the pocket license and a photo ID, and make sure the person in front of you is the person named on the license.
The CSLB provides information about a contractor's license, bond and workers' compensation insurance status, as well as pending and prior legal actions.
anyone who contracts to perform work on a project that requires a building permit, or uses employee labor or worker(s), or contracts for work valued at $1,000 or more for combined labor and materials costs must hold a current, valid license from CSLB.
Contractors are required to have their license number on their business card and on all bids and contracts.
Seeing a license number doesn't necessarily mean the license is valid.
When the contractor comes to your house to give you a bid, ask to see their pocket license, along with a picture I.D. Make sure the person you're dealing with is the same person on the license.
Check the bond and workers' compensation
The license record shows the bond and whether the contractor has filed workers' compensation insurance or an exemption. If people other than the owner will work on your house, ask how they are covered.
Licensed contractors are required to have a contractor license bond of $25,000.
In California, if a contractor has employees, they are required to carry workers' compensation insurance.
Get the contract in writing, with the details in it
A handshake is not enough for any real remodel. The written contract should say who the contractor is, what will be built, with which materials, for what price, and when.
In California, there must be a written contract for all home improvement projects over $500 in combined labor and materials costs.
The contract also must identify the contractor, and give their address and license number.
Required in your contract: a specific description of work to be done, materials to be used, total cost of the project, and start and completion dates.
Keep the money behind the work
The down payment is capped by law, and every payment after it should match work you can see finished. A contractor who asks for a large sum up front to “order materials” is asking you to break a rule that exists to protect you.
That down payment should never exceed 10 percent of the contract price or $1,000, whichever is less.
Don't let payments get ahead of the work.
Know you can change your mind
California gives you a short window to cancel a home improvement contract after signing.
You may cancel within three (3) days of signing a contract, but it must be mailed before midnight of the third day.
Then ask what the license cannot tell you
The CSLB record tells you a contractor is allowed to do the work. It does not tell you who will price your job, who will be on site, or how they behave when something goes wrong. Ask to see finished jobs like yours, with the city and year, and read reviews that describe whole jobs rather than one-line ratings.
Questions worth asking at the estimate: who writes the price, who runs the job day to day, who pulls the permit and meets the inspector, and what happens if something needs fixing after the final payment.
Get at least three written bids on the same plans and scope. The CSLB warns against taking the lowest bid automatically, because one far below the others usually means a mistake or work left out.
Get at least three written bids on your project, and make sure you're comparing bids based on identical plans, specifications, and scope of work.
Do not automatically accept the lowest bid. In fact, you should beware of any bid that is substantially lower than the others.
It probably indicates that the contractor made a mistake or is not including all the work quoted by their competitors.
From our own jobs
How we answer those questions
Eric Saida holds our license and writes every estimate himself. We pull the permit, schedule the inspections and meet the inspector. Our finished jobs are on the projects page with their city and year, and clients' own reviews are linked to the platforms they were written on.