
Culver CityFinished by August 2017
A second floor on a one-story house in Culver City
Skyline Construction and Remodeling added a full second floor to a one-story house in Culver City, finished by August 2017. The job was new construction on top of a lived-in home: framing, stucco, central air, wiring, drywall, a bathroom with a jetted tub and a shower, and hardwood floors through the new rooms.
What we built
The house started as a single-story stucco home with a lawn in front. The photograph we took before work began shows it with our job sign, a portable toilet and a dump trailer in the driveway: the day the job moved in.
The new floor was framed in timber on top of the existing house, then wrapped and finished in stucco to match the walls below. Inside, the photographs show the joists and stud walls of the new rooms, the stair framed up from the ground floor, and later the same rooms with drywall, recessed lights and central air.
The finished second floor has wide-plank hardwood running through the bedrooms and landing, French doors opening onto arched balconies at the front, a walk-in closet, and a bathroom with a jetted tub beside a frameless glass shower in large gray tile. Outside, the roof was finished in clay-colored tile to match.
The job file
- City
- Culver City, Los Angeles County
- When
- Finished by August 2017, when the photographs were published
- Work
- Second-floor room addition, new construction
- Trades
- Framing, stucco, central air, electrical, drywall and recessed lights, tile, hardwood floor, doors, molding, painting
- Rooms added
- Bedrooms with French doors to a balcony, a stair and landing, a bathroom with a jetted tub and a separate shower
- Photographs
- 39 distinct photographs of this job, from the house before work began to the finished rooms
- Not on file
- How many weeks the job took. The contract price. The permit number.
Finished






While it was built


Where these facts come from
- City and job type
Project #1: 2nd floor room addition, new construction in Culver City
Our Yelp photo captions, August 2017 - Trades
Project #1: room addition, new construction, stucco work
Our Yelp photo captions, August 2017 - Photograph set
Room_Addition_Culver_City
24 photographs on our old website named for the job
Written up by Skyline Construction and Remodeling on from the records above. Photographs are of this job only. Location data has been removed from every file, and house numbers, number plates and people are cropped or blurred.
Planning something like this in your house?
Eric comes to see the house and writes the estimate himself. The visit and the written estimate are free.
(888) 216-1885
(888) 216-1885
