(888) 216-1885
Freestanding white tub with a black floor-mounted filler beneath a row of windows and an octagon window, marble-look floor

Pacific Palisades2017 to 2019

A primary bathroom under an octagon window in Pacific Palisades

Skyline Construction and Remodeling rebuilt a primary bathroom in Pacific Palisades, photographed before work in December 2017 and finished in February 2019. A built-in pink jetted tub came out; a freestanding tub now sits under the window, beside a glass shower with a long stone bench, gray tile and black fixtures.

What we built

The room had a pink jetted tub built into a tiled platform under a wide window, with an octagon window above it. That window is the one thing that stayed, and it is how you can tell the before and after photographs are the same room.

The photographs from the middle of the job show the walls opened to the studs and insulation, the old shower gone and the floor stripped. That is where the plumbing for the new layout went in.

The finished room has a freestanding tub on a marble-look floor with a black floor-mounted filler, and a glass shower with a long stone bench, square gray tile, a rain head and black fixtures.

The job file

City
Pacific Palisades, in the City of Los Angeles
When
Before: December 2017. Finished: February 2019 (dates the photographs were taken)
Work
Primary bathroom taken to the studs and rebuilt
Out
A built-in pink jetted tub and white tile surround
In
Freestanding tub and floor-mounted filler, glass shower with a stone bench, gray tile, black fixtures, marble-look floor
Photographs
13 distinct photographs: before, opened up to the studs, and finished
Not on file
How many weeks the job took. The contract price. The permit number. Whether this is the same home as a 2018 Pacific Palisades review about three bathrooms; we have not linked them.

Before and after

After: white freestanding tub with a black filler under the windows, marble-look floor
Before: pink built-in jetted tub under an octagon window and a wide wood-framed window
BeforeAfter

Same corner of the room, December 2017 and February 2019. Drag or use the arrow keys to compare.

Finished

Glass shower with gray square tile, a long bench and black fixtures; octagon window to the right
The shower, octagon window beyond.
Shower bench in stone along the back wall, black hand shower and valves
Stone bench along the shower wall.

While it was built

Bathroom wall opened to the studs with pink insulation and new plumbing lines
Walls open: insulation and new plumbing.
Bathroom stripped to the subfloor with framing exposed and the windows beyond
The room stripped back.

Where these facts come from

Written up by Skyline Construction and Remodeling on from the records above. Photographs are of this job only. Location data has been removed from every file, and house numbers, number plates and people are cropped or blurred.

Planning something like this in your house?

Eric comes to see the house and writes the estimate himself. The visit and the written estimate are free.

(888) 216-1885

Please tell us your name.

Please give a phone number with at least 7 digits, so we can reach you.

This email does not look complete. Check it, or leave it empty.

We use your details only to reply about this job. They are never sold or shared. Privacy

Prefer to talk first? Call (888) 216-1885.