Does my remodel or addition need a Simi Valley permit?
If it is construction, assume yes. The city's Building and Safety Division puts remodels and additions in the same sentence as new buildings, and it reviews drawings with their supporting documents before it issues anything. Simi Valley is its own city, so the County's offices in Ventura and Newbury Park do not handle it.
When the scope is unclear, the Division asks you to call before you start. Have the address, a short description of the work and a rough sketch ready, and ask two things: does this need plan check, and which documents do you want with it.
Prior to the construction of a new building, remodeling or adding to any existing building in the City of Simi Valley, construction permits must be obtained.
If you are planning a home improvement project, and you have any questions about the plan reviewing or permitting process, please call the Building and Safety Division
Who has to draw the plans in Simi Valley?
The city's overview says most buildings and structures are designed by a registered architect or engineer. Section 5537 of the Business and Professions Code, printed in the Architects Practice Act, is narrower than that: it lets an unlicensed person draw a one-family wood-frame home no taller than two stories over a basement, as long as the framing stays conventional. Where a portion does not, for example an engineered beam carrying a removed bearing wall, the building official must require that portion to be drawn by, or under, a licensed architect or registered engineer.
In practice, a simple interior remodel or small one-story addition may be drawn by a designer, while structural changes are likely to come back from plan check asking for an engineer's calculations. Ask the city which it expects for your project before you hire anyone to draw, so you pay for the right drawings once.
Most buildings and structures are required to be designed by an Architect or Engineer registered with the State of California.
(1) Single-family dwellings of woodframe construction not more than two stories and basement in height.
the building official having jurisdiction shall require the preparation of plans, drawings, specifications, or calculations for that portion by, or under the responsible control of, a licensed architect or registered engineer.
How do I apply for a Simi Valley building permit?
Online. Register on the city's Customer Self Service portal, then upload one PDF of the full plan set with the other construction documents as separate files. Every submittal also needs a form that says who is pulling the permit: the contractor fills out the Construction Permit Declaration, and an owner pulling their own permit fills out the Property Owner's Package. Read our guide on owner-builder risks before you take the second route.
Some small jobs skip plan review altogether. The city now auto-issues permits for certain plumbing repairs, electrical panel upgrades and rooftop solar designs approved through SolarAPP+.
If you are the contractor pulling the permit you must fill out the Construction Permit Declaration.
If you are a homeowner and would like to pull the permit for your home, please fill out the Property Owner's Package.
The City of Simi Valley is now auto-issuing permits for certain plumbing repairs or alterations!
How long does plan review take in Simi Valley?
The city publishes its expected times, which is rarer than it should be. A kitchen or bathroom remodel with nothing structural is reviewed in up to a week. Work that needs full plan check goes first to counter staff, then into plan check, and each resubmittal waits as long as the first round. Once plans are approved and the invoice is paid, the city says the permit can take up to three more business days.
By the city's own figures, an addition can spend well over a month in review before work starts, and longer if corrections come back. The cheapest way to shorten that is a complete first submittal with the structural calculations already in it.
Residential bathroom and kitchen remodels that do not have a structural component will take up to one week to review.
All residential and commercial construction that requires plan review will initially be reviewed by counter staff, which may take up to 5 to 10 business days.
Plan check can take 20 to 25 working days and is the same for resubmittals.
When paid it could take up to 3 business days for the permit to be issued.
What are the ADU rules in Simi Valley?
They are being rewritten. The city's Planning Division says its ADU ordinance is under update and points owners to the current standards in the municipal code, its own ADU guide and the state's ADU Handbook. Check the standards again just before you file, because a size or setback rule you designed to may have changed. The city also asks owners with ADUs to fill in a short occupancy and rent survey as part of the permit.
The City's Accessory Dwelling Unit Ordinance and development standards are currently undergoing updates.
As part of the permitting process, the City requests property owners with one or more ADUs to complete the Accessory Dwelling Unit Occupancy and Rents Survey.