Who issues building permits in Oak Park and unincorporated Ventura County?

Ventura County Building and Safety issues them. Oak Park is not a city; the County of Ventura governs it, so its permits come from the County's offices in Ventura and Newbury Park. Any address outside an incorporated Ventura County city works the same way; inside a city, that city issues the permit.

Is Oak Park part of Agoura Hills or Thousand Oaks?

No. Oak Park sits right against Agoura Hills, and plenty of people assume it belongs to one of its neighbors, but it is not a city. The County of Ventura governs it, and for building purposes that means the County's Building and Safety Division is your department, with the County's code, fees and inspectors.

This matters most when you are collecting bids. A contractor who mostly works in Agoura Hills or Thousand Oaks may assume city rules and city review times, and both are different here. Ask anyone bidding on an Oak Park job which department they expect to file with; the right answer is the County.

Oak Park is an unincorporated community governed by the County of Ventura.

[1] County of Ventura, Supervisor District 2, Oak Park MAC

Where do I apply for a County permit?

Ventura County Building and Safety has two permit counters: the main office in Ventura and an east-county office in Newbury Park, which is the closer one for Oak Park. The County's VC Citizen Access portal lets you look up permits on your property, upload plans and documents, check where an application stands and pay fees online.

Before you apply, the County's Permit Fee Estimator gives a figure for Building and Safety's own fees. It does not include fees other departments or agencies collect, so treat it as part of the total, not the total.

The counters open at 8 a.m. on Monday, Tuesday, Wednesday and Friday and at 9 a.m. on Thursday, and close at 4 p.m. each weekday.

If your project is located in the unincorporated areas of Ventura County, you can obtain your permit at one of the two B&S permit offices. The main B&S office is in Ventura.

[2] County of Ventura, Frequently Asked Questions for Building Permit Information

Using VC Citizen Access, members of the public can search and review permit information, and permit applicants and property owners can upload and download documents, look up processing statuses, and pay for permit fees online using a credit card.

[3] County of Ventura, VC Citizen Access

It will list only fees collected by Building and Safety.

[2] County of Ventura, Frequently Asked Questions for Building Permit Information

Counter Hours: 8:00 AM to 4:00 PM, Monday through Wednesday and Friday; and 9:00 AM to 4:00 PM on Thursday

[6] Ventura County Resource Management Agency, Building and Safety

What if my address is inside a Ventura County city?

Then the County is not your building department. The County's own FAQ says each incorporated city issues its permits, and it names Simi Valley, Thousand Oaks, Ventura and Oxnard among them. Camarillo and Moorpark run their own departments too. If you are unsure which side of a city line you are on, call the County's Newbury Park office with your address and ask before anyone draws plans.

If your project is located within the City limits of an incorporated city in Ventura County, such as Simi Valley, Thousand Oaks, Ventura, Oxnard, Ojai, Santa Paula, Fillmore, etc, then the permit will be issued by that City.

[2] County of Ventura, Frequently Asked Questions for Building Permit Information

What work can I do without a County permit?

Less than many owners hope. The County's exempt-work list, Section 105.2 of the Ventura County Building Code, covers building work only: finish work, small sheds, low fences and walls, low decks and similar items. It says nothing about electrical, plumbing or mechanical work, so new cabinets and counters may be exempt while moving the sink or adding a circuit behind them is a separate question. Read the list against your actual scope, and if your job is close to a line, ask the County's counter staff before you start rather than after.

Skipping a permit can cost you later. The County points out that lenders and insurers use the permit record to confirm that a building and its improvements are legal, so unpermitted work can come up when either of them looks at the house.

Most construction projects are required to have a valid permit before construction begins. Some small projects, repairs, and minor improvements are exempt from permits.

[2] County of Ventura, Frequently Asked Questions for Building Permit Information

Painting, papering, tiling, carpeting, cabinets, counter tops, and similar finish work.

[4] Ventura County Building Code, Section 105.2 Exempted work (PDF)

Fences not over 7 feet high measured from adjacent grade on the side which yields the greatest height, unless supporting a surcharge or structural element.

[4] Ventura County Building Code, Section 105.2 Exempted work (PDF)

Building Permits are required by law. So they also serve as a legal document used by lending institutions, insurance companies, and others to confirm that the building and related improvements are legal.

[2] County of Ventura, Frequently Asked Questions for Building Permit Information

How long does County plan review take, and how long is a permit good for?

Plan for more than one round. The County says its first review usually takes three to four weeks once the application is complete, follow-up reviews take one or two weeks, and most projects go through two or three reviews before the permit is issued. Corrections take the longest when the drawings were thin to begin with, so a complete first set saves more time than anything else you can do.

Watch the expiry dates too. An application that has not become a permit within 12 months expires, and an issued permit lapses if work does not start within 12 months or stops for 180 days. On a long remodel, keep inspections moving so the permit stays alive.

Building and Safety will usually complete the first review of the plans in about three to four weeks from the date a complete application is accepted

[2] County of Ventura, Frequently Asked Questions for Building Permit Information

You should plan your project schedule on the basis that you will need two or three B&S reviews and enough time for your designer to answer questions, make plan revisions, correct errors, etc.

[2] County of Ventura, Frequently Asked Questions for Building Permit Information

Building Permit applications expire 12 months following the date of the application if the permit has not been issued by that date.

[2] County of Ventura, Frequently Asked Questions for Building Permit Information

if the work authorized by such permit is suspended or abandoned for a period of 180 days or more, at any time after the work is commenced.

[2] County of Ventura, Frequently Asked Questions for Building Permit Information

Does the County have ready-made ADU plans?

Yes. The County offers free standardized plans for detached ADUs in one, two and three-bedroom layouts, already reviewed by Building and Safety. Using them exactly as approved can save design cost and review time, but you cannot move doors, vents or plumbing connections, and you still need any Planning permit plus a Building Permit for your lot.

The standardized plans are free of charge.

[5] County of Ventura, Standardized Plans for Accessory Dwelling Units

Note: You must still obtain the appropriate permit from the Planning Division (if applicable) and a Building Permit from the Building and Safety Division.

[5] County of Ventura, Standardized Plans for Accessory Dwelling Units

From our own jobs

Our work around Oak Park

We remodeled a bathroom, with new tile, shower, cabinets and countertop, that our photo files label Oak Park; the photos were posted by 2017. Our old project map tagged the same job Agoura Hills, the city next door, so we are confirming which side of the line it was on. We have no County permit record for it in the public sample we have read.

Sources

  1. 1County of Ventura, Supervisor District 2, Oak Park MACsupervisorgorell.venturacounty.gov, read November 25, 2026
  2. 2County of Ventura, Frequently Asked Questions for Building Permit Informationrma.venturacounty.gov, read November 25, 2026
  3. 3County of Ventura, VC Citizen Accessrma.venturacounty.gov, read November 25, 2026
  4. 4Ventura County Building Code, Section 105.2 Exempted work (PDF)rmadocs.venturacounty.gov, read November 25, 2026
  5. 5County of Ventura, Standardized Plans for Accessory Dwelling Unitsrma.venturacounty.gov, read November 25, 2026
  6. 6Ventura County Resource Management Agency, Building and Safetyrma.venturacounty.gov, read November 25, 2026

Ventura County updates its exempt-work list and standard plans; check both against your address in Oak Park or the county.

Want the answer for your house?

Eric comes to see it and writes the estimate himself, permits included. The visit and the written estimate are free.

(888) 216-1885

Please tell us your name.

Please give a phone number with at least 7 digits, so we can reach you.

This email does not look complete. Check it, or leave it empty.

We use your details only to reply about this job. They are never sold or shared. Privacy

Prefer to talk first? Call (888) 216-1885.