Who issues building permits in Camarillo and Moorpark?

Each city issues its own. Camarillo's and Moorpark's Building and Safety Divisions are both staffed under contract by Charles Abbott Associates, and both take plans digitally: Camarillo only through its OpenGov portal since July 1, 2025, Moorpark through its SHOP portal, email or flash drive. Ventura County Building and Safety does not issue permits inside either city.

Why doesn't Ventura County issue permits in Camarillo or Moorpark?

Because both are incorporated cities, and Ventura County Building and Safety only covers land outside city limits. The County's FAQ names Simi Valley, Thousand Oaks and others and ends with "etc"; Camarillo and Moorpark both fall under that rule and run their own Building and Safety Divisions. If your address turns out to be outside both city limits, the County is your department instead, and our Ventura County guide covers it.

A contract-run department is still the city's department. The staff may be employed by a private firm, but you apply to the city, pay the city's fees and build to the city's code amendments.

If your project is located within the City limits of an incorporated city in Ventura County, such as Simi Valley, Thousand Oaks, Ventura, Oxnard, Ojai, Santa Paula, Fillmore, etc, then the permit will be issued by that City.

[1] County of Ventura, Frequently Asked Questions for Building Permit Information

Who runs Building and Safety in Camarillo?

Charles Abbott Associates, a firm based in Mission Viejo, staffs the division under contract, working from Camarillo City Hall at 601 Carmen Drive. The same group handles plan check, permits and inspections, so plan review and inspection come from one team rather than two offices.

Building & Safety services are provided contractually, by Charles Abbott Associates, Inc. of Mission Viejo. This group of employees work in Camarillo City Hall handling the permitting, inspection and plan check services for the city.

[2] City of Camarillo, Building & Safety

How do I file plans in Camarillo, and what are the surcharges?

Online only. Since July 1, 2025 Camarillo has stopped taking paper plans; applications, payments, progress tracking and inspection requests all go through the city's OpenGov customer portal. If your designer still works on paper, ask them to deliver a PDF set before you book a submittal.

Camarillo also added two surcharges on July 1, 2025. The 11.34 percent Technology Surcharge applies to the fees in Exhibits A, B and F. The 17.89 percent General Plan Maintenance Surcharge applies to residential permit and plan check fees, except residential alterations that are nonstructural. A cosmetic kitchen or bathroom remodel may therefore avoid the larger one, while an addition will not; ask the counter to confirm for your scope.

Rooftop solar on a house has a quicker route. Camarillo issues automated permits for eligible new residential rooftop solar systems through SolarAPP+.

All plan submissions must be done digitally through the new online permitting and licensing system powered by OpenGov.

[3] City of Camarillo, Online Permitting & Licensing (OpenGov)

Beginning July 1, 2025, the City of Camarillo will charge a Technology Surcharge of 11.34% to cover routine maintenance and investment in the City’s land management software and systems

[2] City of Camarillo, Building & Safety

This surcharge applies to fees listed in Exhibit A, and all residential and commercial building permit and plan check fees except for nonresidential alterations/improvements and residential alterations (nonstructural) in Exhibit F.

[2] City of Camarillo, Building & Safety

The City of Camarillo has automated permitting for eligible new residential rooftop solar projects through SolarAPP+.

[2] City of Camarillo, Building & Safety

Who runs Building and Safety in Moorpark, and how do I apply?

Charles Abbott Associates again, under its own contract with the City of Moorpark, which reviews plans and issues permits under the 2025 California codes. Moorpark is a little more flexible than Camarillo about how plans arrive: through the Moorpark Self-Help Online Portal (SHOP), by email, or on a flash drive, and small paper sets may be taken case by case.

The Building and Safety Division, provided through contract services by Charles Abbott Associates, reviews plans and issues building permits for compliance with:

[4] City of Moorpark, Building & Safety

The City of Moorpark Community Development Department only accepts electronic plan check submittals; physical plans are no longer accepted.

[4] City of Moorpark, Building & Safety

What work is exempt from a permit in Moorpark?

Moorpark publishes a clear list. Cosmetic work, small sheds, low fences and walls, and minor roof patches can go ahead without a building permit, within the limits the city sets. The moment new cabinets change plumbing or electrical, or a roof repair touches the framing or reaches a quarter of the roof, you are back to needing a permit. An exemption also does not excuse the work from zoning or High Fire Zone rules, so check those separately.

Cosmetic changes like: residential painting, replacement/refacing of cabinets (without changing plumbing/electrical), countertop replacement, decorative tile installations, and floor finishes (carpet, tile, linoleum, etc.).

[5] City of Moorpark, Work Exempt from Building Permits

Roof repairs or replacements that are less than 25% of the existing roof area, do not involve the underlying framing, and occur no more than once in a 12-month period.

[5] City of Moorpark, Work Exempt from Building Permits

NOTE: Exemption from a building permit does not exempt the project from complying with other City ordinances, Zoning Code requirements, or High Fire Zone restrictions.

[5] City of Moorpark, Work Exempt from Building Permits

Does Moorpark have standard ADU plans?

Yes, in 700, 900 and 1,188 square foot sizes. They cover the structure and a rough floor plan only. You still need a site plan with setbacks, mechanical, electrical and plumbing plans, Title 24 energy forms, and sign-offs from the fire department, the water or sanitary district and the school district. With the standard plans, Moorpark also notes that an ADU cannot go in a floodplain, on a slope, or close to a property line or another building.

These plans only cover structural design and act as rough floor plans.

[6] City of Moorpark, Accessory Dwelling Units

Less than 5' from property lines or adjacent structures

[6] City of Moorpark, Accessory Dwelling Units

From our own jobs

Our work in Camarillo

In 2018 we remodeled the kitchen and three bathrooms of a Camarillo house while the owners were living elsewhere; our old site named both the job and the client as Camarillo. A second client, whose Yelp profile gives Camarillo, wrote in 2022 that their kitchen took three weeks from demolition to moving back in. We have no documented Moorpark job yet.

A client, in their own words

Then 5 weeks later he was done yup unbelievable but true! We had our kitchen remodeled and 3 bathrooms remodeled too
Patsy H., Yelp, November 19, 2018

Sources

  1. 1County of Ventura, Frequently Asked Questions for Building Permit Informationrma.venturacounty.gov, read November 25, 2026
  2. 2City of Camarillo, Building & Safetycityofcamarillo.org, read November 25, 2026
  3. 3City of Camarillo, Online Permitting & Licensing (OpenGov)cityofcamarillo.org, read November 25, 2026
  4. 4City of Moorpark, Building & Safetymoorparkca.gov, read November 25, 2026
  5. 5City of Moorpark, Work Exempt from Building Permitsmoorparkca.gov, read November 25, 2026
  6. 6City of Moorpark, Accessory Dwelling Unitsmoorparkca.gov, read November 25, 2026

Camarillo and Moorpark post their own permit lists; check the page for your city, as the two are not the same.

Want the answer for your house?

Eric comes to see it and writes the estimate himself, permits included. The visit and the written estimate are free.

(888) 216-1885

Please tell us your name.

Please give a phone number with at least 7 digits, so we can reach you.

This email does not look complete. Check it, or leave it empty.

We use your details only to reply about this job. They are never sold or shared. Privacy

Prefer to talk first? Call (888) 216-1885.