A primary bathroom in Oak Park, from open studs to a freestanding tub

Skyline Construction and Remodeling rebuilt a primary bathroom in Oak Park, photographed at every stage and posted by August 2017. The room was opened to the studs, the shower pan hot-mopped and the walls waterproofed before tile. It finished with a glass shower and bench, a freestanding tub under the window and a white double vanity.

What we built

The old bathroom came out down to the framing. With the walls open, the shower was re-framed with a half wall and a bench, and the shower pan was hot-mopped: a layer of hot asphalt that makes the floor of a tiled shower watertight before the mortar bed goes in.

The walls inside the shower were then covered in a waterproofing membrane, with the valve and niche openings sealed, before any tile was set. That is the stage nobody sees afterwards and the one that decides whether a shower lasts.

The finished room has a frameless glass shower set on the tiled half wall, with long gray grained wall tile, a tiled bench, a niche lined in strip mosaic and a hexagon mosaic floor. A freestanding tub sits under the window with its faucet on a short tiled riser, and a white double vanity with two undermount sinks and two framed mirrors faces it across a dark plank-look floor.

The job file

City
Oak Park, unincorporated Ventura County (our old project map listed it under Agoura Hills, next door)
When
Finished by August 15, 2017, when we posted the photographs
Work
Primary bathroom opened to the studs, re-framed, hot-mopped, waterproofed and tiled
In
Frameless glass shower with a tiled bench, a niche lined in strip mosaic and a hexagon mosaic floor, freestanding tub with its faucet on a short tiled riser, white double vanity with two undermount sinks and two framed mirrors, dark plank-look floor
Photographs
6 shown here, from 10 we hold
Not on file
The exact year: we know only that the photographs were posted by August 15, 2017. How many weeks the job took. The permit number.

Finished

Tiled shower bench above a hexagon mosaic shower floor with a center drain
The bench and hexagon mosaic floor.
White freestanding tub under a frosted window on a dark plank-look floor
Freestanding tub under the window.
White double vanity with a mosaic backsplash and two dark-framed mirrors
The double vanity.

While it was built

Bathroom with walls open to the studs, a new framed shower half wall wrapped in membrane and the shower walls being tiled
Studs open, the half wall framed, tile going up.
Shower walls covered in black waterproofing membrane with sealed openings for the valve and niche
Waterproofing on the shower walls before tile.

Where these facts come from

Written up by Skyline Construction and Remodeling on from the records above. Photographs are of this job only. Location data has been removed from every file, and house numbers, number plates and people are cropped or blurred.

Planning something like this in your house?

Eric comes to see the house and writes the estimate himself. The visit and the written estimate are free.

(888) 216-1885

Please tell us your name.

Please give a phone number with at least 7 digits, so we can reach you.

This email does not look complete. Check it, or leave it empty.

We use your details only to reply about this job. They are never sold or shared. Privacy

Prefer to talk first? Call (888) 216-1885.