Oak Park2017 or earlier
A primary bathroom in Oak Park, from open studs to a freestanding tub
Skyline Construction and Remodeling rebuilt a primary bathroom in Oak Park, photographed at every stage and posted by August 2017. The room was opened to the studs, the shower pan hot-mopped and the walls waterproofed before tile. It finished with a glass shower and bench, a freestanding tub under the window and a white double vanity.
What we built
The old bathroom came out down to the framing. With the walls open, the shower was re-framed with a half wall and a bench, and the shower pan was hot-mopped: a layer of hot asphalt that makes the floor of a tiled shower watertight before the mortar bed goes in.
The walls inside the shower were then covered in a waterproofing membrane, with the valve and niche openings sealed, before any tile was set. That is the stage nobody sees afterwards and the one that decides whether a shower lasts.
The finished room has a frameless glass shower set on the tiled half wall, with long gray grained wall tile, a tiled bench, a niche lined in strip mosaic and a hexagon mosaic floor. A freestanding tub sits under the window with its faucet on a short tiled riser, and a white double vanity with two undermount sinks and two framed mirrors faces it across a dark plank-look floor.
The job file
- City
- Oak Park, unincorporated Ventura County (our old project map listed it under Agoura Hills, next door)
- When
- Finished by August 15, 2017, when we posted the photographs
- Work
- Primary bathroom opened to the studs, re-framed, hot-mopped, waterproofed and tiled
- In
- Frameless glass shower with a tiled bench, a niche lined in strip mosaic and a hexagon mosaic floor, freestanding tub with its faucet on a short tiled riser, white double vanity with two undermount sinks and two framed mirrors, dark plank-look floor
- Photographs
- 6 shown here, from 10 we hold
- Not on file
- The exact year: we know only that the photographs were posted by August 15, 2017. How many weeks the job took. The permit number.
Finished



While it was built


Where these facts come from
- Stages
Project #3: framing, shower, tile work, hotmop
Our Yelp photo captions, August 15, 2017 - Finishes
Project #3: tub, tile, paint, molding, window
Our Yelp photo captions, August 15, 2017 - City
Bathroom_Remodel_Oak_Park
Our own file names for these photographs
Written up by Skyline Construction and Remodeling on from the records above. Photographs are of this job only. Location data has been removed from every file, and house numbers, number plates and people are cropped or blurred.