Who issues the permit
Inside the City of Los Angeles, which includes the San Fernando Valley neighborhoods such as Woodland Hills, Tarzana, Encino and North Hollywood, building permits come from LADBS. Cities such as Burbank, Glendale, Calabasas or Culver City have their own building departments and their own local rules on top of state law.
The City's local ADU rules sit in the municipal code, adopted in 2019.
Turning a garage into living space goes through plan review on ePlanLA. If the garage was permitted, have its certificate of occupancy and earlier permits ready, because plan check uses them to confirm what the building is allowed to be.
On December 11, 2019, the City of Los Angeles adopted the Accessory Dwelling Unit Ordinance (Ordinance 186,481) which went into effect on December 19, 2019.
Converting a garage to habitable space (often an ADU) requires plan review through ePlanLA.
If the existing building has previously been permitted, a copy of the building’s Certificate of Occupancy and previous building permits shall be provided at the plan check stage to verify the permitted use of the structure.
How long the City has to decide
State law sets a clock once your application is complete. If the City says no, it has to say why and how to fix it.
Requires a permitting agency to either approve or deny (replacing the former language “act on”) an application to create or serve an ADU or JADU within 60 days from when a completed application is received, if there is an existing single-family or multifamily dwelling on the lot
You do not have to replace the parking
This is the rule that makes most garage conversions possible on a city lot.
When a garage, carport, uncovered parking space, or covered parking structure is demolished in conjunction with the construction of an ADU, or converted to an ADU, the local agency shall not require that those off-street parking spaces for the primary unit be replaced
What if the garage becomes an office or a gym?
Then the parking rule above does not help. State law waives replacement parking only when the garage is converted to an accessory dwelling unit, and an office, gym or studio is not one. The permit path for the building work is much the same whatever the room is called; parking is where the two part ways.
Without the ADU waiver, the City's own parking count applies. LADBS's parking summary asks for two spaces on site for a one-family house, with more on some hillside lots and fewer on narrow lots without an alley, and lets lots that qualify under AB 2097 use reduced parking. Before designing the room, look the lot up in ZIMAS and ask plan check where the spaces will go.
When a garage, carport, covered parking structure, or uncovered parking space is demolished in conjunction with the construction of an accessory dwelling unit or converted to an accessory dwelling unit, the local agency shall not require that those offstreet parking spaces be replaced.
One-Family Dwelling (SFD) or group of one family dwellings 2 (on-site only)
SFD on a narrow lot, 40 ft or less in width and not abutting an alley requires only one parking space.
Projects eligible to use AB 2097 as indicated on ZIMAS parcel profile report at the time of plan check submittal are able to utilize reduced parking requirements.
What setbacks apply when a garage is converted in place?
Many older garages sit close to the side or rear property line. Converting the existing structure, or rebuilding it in the same place to the same size, keeps that position.
No setback shall be required for an ADU or JADU created within an existing living area or accessory structure or an ADU created in a new structure in the same location and to the same dimensions as an existing structure
An attached garage can become a JADU
A junior accessory dwelling unit is a smaller unit inside the house itself, up to 500 square feet. An attached garage counts as part of the house.
A “junior accessory dwelling unit” or JADU is a unit that is no more than 500 square feet of interior livable space in size and contained entirely within a single-family residence.
Local agencies may not require parking as a condition to permitting a JADU, even when the JADU is converted from an attached garage
What the permit does not change
The conversion still has to meet the building code as a place to live: insulation, egress windows, a proper floor, electrical and plumbing to code, and inspections at each stage. That is where most of the cost and time in a garage conversion goes, and it is the part an inspector checks.
At the end, LADBS issues a certificate of occupancy once the final inspection passes and the other City departments have given their clearances.
The Certificate of Occupancy will be issued by the LADBS after the final inspection is approved and the required clearances from other city departments have been approved.