When do I need a building permit in Thousand Oaks?

For nearly any remodel, trade replacement or ADU, and it comes from the City of Thousand Oaks Building Division rather than Ventura County. Water heater, wiring and HVAC permits are processed quickly; inspections, permit status and old permit records all run through the city's TO/24 portal; and tearing down any building needs its own demolition permit.

Does the City or Ventura County issue permits in Thousand Oaks?

The City. Ventura County Building and Safety covers only land outside city limits, from its main office in Ventura and a second office in Newbury Park. That Newbury Park office is easy to mistake for the city's, but an address inside Thousand Oaks city limits goes to the City's Building Division at City Hall, 2100 Thousand Oaks Boulevard. If your house is in unincorporated Oak Park next door, the County is your department instead, and our Ventura County guide covers it.

If your project is located within the City limits of an incorporated city in Ventura County, such as Simi Valley, Thousand Oaks, Ventura, Oxnard, Ojai, Santa Paula, Fillmore, etc, then the permit will be issued by that City.

[1] County of Ventura, Frequently Asked Questions for Building Permit Information

We also have a Building and Safety office on the east side of the County, in Newbury Park

[1] County of Ventura, Frequently Asked Questions for Building Permit Information

Which small jobs does the Building Division turn around quickly?

The Division names a set of permit types it tries to process as soon as possible when the request arrives during business hours. Most are the everyday trade jobs inside a remodel:

  • Water heaters and plumbing fixtures such as toilets and sinks
  • Repair or replacement of gas, water or sewer lines
  • Electric services up to and including 200 amps
  • Minor electrical work, such as new outlets, switches or light fixtures
  • Furnaces and HVAC units in existing homes
  • Small solar PV systems and EV charging stations

Replacement of electric services up to and including 200 amps

[2] City of Thousand Oaks, Building Division

Minor electrical work, such as adding outlets, switches, or light fixtures

[2] City of Thousand Oaks, Building Division

Installation or replacement of furnaces and HVAC units in existing dwellings

[2] City of Thousand Oaks, Building Division

Replacement of water heaters and plumbing fixtures such as toilets and sinks

[2] City of Thousand Oaks, Building Division

What catches people out on a quick trade permit?

The site plan. An air conditioner installation or change-out needs one, showing where the unit sits, the lot dimensions and the unit's distance from the property line, so measure before you apply. A kitchen remodel that keeps the layout and leaves the structure alone can be permitted as separate plumbing, electrical and mechanical permits. Moving walls or adding space brings in plan review.

How do payment, permit pickup and the final sign-off work in Thousand Oaks?

City staff contact you for payment once the permit is ready, and every fee has to be paid before it is issued; cards can be used online by permit number or address. Issued permits are collected in person and are no longer mailed. Public counter hours change by weekday and the counter opens only on alternating Fridays, so call before you go.

New buildings and structures, which includes a detached ADU, need a certificate of occupancy before anyone moves in. It marks the end of the work the building permit allowed.

Inspections are booked only through the TO/24 portal, which is also where you check a permit's status.

Prior to permit issuance, you must pay all associated fees.

[2] City of Thousand Oaks, Building Division

Issued permits are for pick-up.

[2] City of Thousand Oaks, Building Division

All new buildings and structures require a certificate of occupancy before being occupied.

[2] City of Thousand Oaks, Building Division

Inspections can now only be scheduled through your TO/24 portal.

[2] City of Thousand Oaks, Building Division

What do ADU building fees run in Thousand Oaks?

The city publishes an average. Plan check and permit fees for an ADU have come to between $2,800 and $3,200 a unit over the past three years. That covers the building side only. A planning review fee is charged separately as a fixed fee, and impact and utility connection fees come on top, collected for several agencies.

Size is the lever. Units under 750 square feet are not subject to impact fees such as parkland and school fees, under state law. Plan for the tax bill as well, because the city says property taxes rise with the value of the ADU.

The average fees charged over the past three years are between $2,800 and $3,200 per unit.

[3] City of Thousand Oaks, Accessory Dwelling Units

These fees offset impacts to public services that result from the project, including impact fees from the City, Conejo Valley Unified School District, Thousand Oaks Police Department, Ventura County Fire Department, and Conejo Recreation and Park District.

[3] City of Thousand Oaks, Accessory Dwelling Units

Units less than 750 sq. ft. will cost less to build, and in accordance with state law, these smaller units are not subject to impact fees such as parkland and school fees.

[3] City of Thousand Oaks, Accessory Dwelling Units

Your taxes will increase based on the value of the ADU.

[3] City of Thousand Oaks, Accessory Dwelling Units

Which Thousand Oaks ADU rules catch owners out?

Four, from the city's own FAQ. A junior ADU ties the owner to the property, because any lot with one must be owner-occupied. Neither kind of unit can be rented for less than 30 days, and an ADU cannot be sold apart from the house. A pre-approved design from the city's ADU Plans Gallery is the fastest route, but it still needs site planning for your lot, including where the unit sits, emergency access and the foundation.

However, any property with a JADU must be owner-occupied.

[3] City of Thousand Oaks, Accessory Dwelling Units

ADUs and JADUs may be rented for a minimum term of 30 days, per state law.

[3] City of Thousand Oaks, Accessory Dwelling Units

The City does not allow sale of ADUs separate from the rest of the property.

[3] City of Thousand Oaks, Accessory Dwelling Units

All plans – even pre-approved plans – still require customized site planning and permitting based on your property.

[3] City of Thousand Oaks, Accessory Dwelling Units

What if an ADU on the property was built without permits?

Look the address up on TO/24 first; the city points owners there to check the permit history. A unit built before January 1, 2020 can be legalized under AB 2533. The city cannot deny that permit over code or local ordinance problems unless the building is substandard under Health and Safety Code section 17920.3, it will not penalize the owner for the unpermitted unit, and impact and connection charges are waived unless utility work is needed to meet that section. The city suggests a confidential code inspection by a licensed contractor before you apply, so you know the likely scope.

If you aren’t sure if your existing ADU or JADU was built with permits, you can check the property permit history by looking up the address on TO24.

[3] City of Thousand Oaks, Accessory Dwelling Units

A homeowner applying for a permit for a previously unpermitted accessory dwelling unit or junior accessory dwelling unit constructed before January 1, 2020, shall not be required to pay impact fees or connection or capacity charges except when utility infrastructure is required to comply with Section 17920.3 of the Health and Safety Code

[3] City of Thousand Oaks, Accessory Dwelling Units

Do I need a separate permit to tear down a garage or shed?

Yes. Thousand Oaks Municipal Code section 8-4.13 requires a separate demolition permit for each building or structure, or part of one. Taking down a garage to make room for an ADU is a demolition permit of its own, apart from the ADU permit.

The order matters. Where a sewer line has to be capped, the sewer cap permit comes first and must be inspected and finaled before the demolition permit is issued, and that final needs written notice from the utilities that gas, electric, water and sewer service has been removed. The city also wants an approved construction and demolition debris recycling plan and written approval from the Ventura County Air Pollution Control District. Mark any oak or landmark trees on the site plan.

No person, firm or corporation shall raze any building or structure, or portion thereof, in the City, or cause the same to be done, without first obtaining a separate Demolition Permit for each building or structure from the Building Official.

[4] City of Thousand Oaks, Building Demolition Permit Procedures (October 2023)

A plumbing sewer cap permit is required to disconnect/abandon the wastewater sewer, the demolition permit shall not be issued until the plumbing permit has been inspected and finalized.

[4] City of Thousand Oaks, Building Demolition Permit Procedures (October 2023)

How do I check a Thousand Oaks house's permit history?

On TO/24, at no charge. Since June 2, 2023 the city no longer requires a residential building records report when a house is sold, so a buyer has to look it up. The public search works without an account and exports the records as a spreadsheet. Read the statuses carefully: permits now show as expired instead of being re-inspected, so an expired permit on the list is a question for the seller before you plan a remodel around it.

As of June 2, 2023, residential building records are no longer required for the sale or exchange of a residential property.

[2] City of Thousand Oaks, Building Division

You can access these reports via a self-service portal, and there will no longer be a cost for obtaining them.

[2] City of Thousand Oaks, Building Division

Please note that permits will now show as 'expired' instead of being re-inspected.

[2] City of Thousand Oaks, Building Division

From our own jobs

What we have done in Thousand Oaks

BuildZoom attributes three 2025 City of Thousand Oaks permits to our license, for the plumbing, electrical and mechanical work of a like-for-like kitchen remodel with no structural change, finaled on March 17, 2025. We have not yet confirmed that job against our own records, so read it as a public-record attribution. Earlier, we posted photos of a Thousand Oaks bathroom remodel on Yelp in 2017. Our nearest job with a full photo record is a primary bathroom in Oak Park.

Sources

  1. 1County of Ventura, Frequently Asked Questions for Building Permit Informationrma.venturacounty.gov, read November 25, 2026
  2. 2City of Thousand Oaks, Building Divisiontoaks.gov, read November 25, 2026
  3. 3City of Thousand Oaks, Accessory Dwelling Unitstoaks.gov, read November 25, 2026
  4. 4City of Thousand Oaks, Building Demolition Permit Procedures (October 2023)toaks.gov, read November 25, 2026

Thousand Oaks and the county share some rules but not all; confirm which applies to your lot with the city.

Want the answer for your house?

Eric comes to see it and writes the estimate himself, permits included. The visit and the written estimate are free.

(888) 216-1885

Please tell us your name.

Please give a phone number with at least 7 digits, so we can reach you.

This email does not look complete. Check it, or leave it empty.

We use your details only to reply about this job. They are never sold or shared. Privacy

Prefer to talk first? Call (888) 216-1885.